All done for now a dishwasher, stove and fridge will make this look even better along with floor repair and tile backsplash.
Time to cut the back of the sink cabinet and then fit and level them.
I ledger board installed and end panel also installed.
Set up lazier level for the frig space and cabinet top before the counter.
Tape on and marked, time for the money cuts.
Transferred to the back and made the cut time to make sure there are no chips on front.
The finish cut looks great. Yes
Next I had to cut in the sink and install the plumbing as normal didn't take pictures the sink clips were lots of fun as there wasn't much room.
We love our customers, so feel free to visit during normal business hours.
Open today | 09:00 am – 05:00 pm |
Copyright © 2020 Bills Handyman Brooks ,llc - All Rights Reserved.
Veterans and first re-sponders both get a discount.